2021 |
-
1) Basic design for floating structure transportation/installation
-
2) Floating structure-mooring mechanism analysis
-
3) Anchor specifications and operational conditions review
-
4) Offshore transportation safety analysis
|
2022 |
-
1) Review of transportation/installation equipment specifications
-
2) Hook-Up procedure
-
3) Transportation/installation scenario
-
4) Basic mooring system design support for 10~15MW Design Platform
|
2023 |
-
1) Review of floating structure launching methods
-
2) MWS verification
-
3) Basic mooring system design support for 0~15MW Design Platform
|
2024 |
-
1) Mooring system monitoring
-
2) Logic design support for 10~15MW Design Platform mooring system
|
2025 |
-
1) Mooring system monitoring and data analysis
-
2) Digitalization and operational verification of 10~15MW Design Platform mooring system logic
|