FOWT
8MW Class - Development of 8MW
Floating Offshore Wind Turbine System
Client : Doosanenerbility
Period : 2021. 07 ~ 2025. 12
Business Details
2021
  • 1) Basic design for floating structure transportation/installation
  • 2) Floating structure-mooring mechanism analysis
  • 3) Anchor specifications and operational conditions review
  • 4) Offshore transportation safety analysis
2022
  • 1) Review of transportation/installation equipment specifications
  • 2) Hook-Up procedure
  • 3) Transportation/installation scenario
  • 4) Basic mooring system design support for 10~15MW Design Platform
2023
  • 1) Review of floating structure launching methods
  • 2) MWS verification
  • 3) Basic mooring system design support for 0~15MW Design Platform
2024
  • 1) Mooring system monitoring
  • 2) Logic design support for 10~15MW Design Platform mooring system
2025
  • 1) Mooring system monitoring and data analysis
  • 2) Digitalization and operational verification of 10~15MW Design Platform mooring system logic