2021 |
-
1) Basic Design for Floating Structure Transportation/Installation
-
2) Floating Structure-Mooring Mechanism Analysis
-
3) Anchor Specification and Work Condition Review
-
4) Offshore Transportation Safety Analysis
|
2022 |
-
1) Transportation/Installation Equipment Specification Review
-
2) Hook-Up Procedure
-
3) Transportation/Installation Scenario
-
4) Basic Design Support for 10~15MW Design Platform Mooring System
|
2023 |
-
1) Floating Structure Launching Method Review
-
2) MWS Verification
-
3) Basic Design Support for 0~15MW Design Platform Mooring System
|
2024 |
-
1) Mooring System Monitoring
-
2) Logic Design Support for 10~15MW Design Platform Mooring System
|
2025 |
-
1) Mooring System Monitoring and Data Analysis
-
2) Digitalization and Operational Validation of Logic for 10~15MW Design Platform Mooring System
|