Construction
Barossa FPSO Project
Client :
BW Offshore(BWO) / FG Ind.
Period :
2021.04 ~ 2022.12
Details
Description
  • tructural Analysis.
  • Reviewed 48 items, including Antenna Tower & Underdeck Support Calculation.
  • Conducted static and dynamic analysis for major equipment on the FPSO.
  • Secured basic design capability for the hull structure through DNV review.
  • In addit